Welcome to ZTA POWER COMPANY
May
17 2021Operating rules and precautions of the name generator company
1. Before starting the best portable power generator, you must check the coolant level, lubricating oil level, and fuel level, and check for leakage. If the oil level is lower than the specified value, it should be added to Normal position.
2. Before starting the the best chinese generator, check whether the electrical circuit is loose, whether there is any sundries inside the electric ball, and whether the battery terminal is loose.
3. Check whether the fuel supply valve and the cooling water stop valve are in the open position.
4. Before running or doing generator set maintenance and repair, you should read the detailed operating procedures.
5. During any maintenance or repair, the AC, DC and external power supply must be disconnected.
6. When carrying out any repairs or maintenance, the battery and the load on the site must be disconnected first.
7. When handling fuel, engine oil, batteries and electrolyte, necessary protective measures must be taken to protect the skin and eyes.
8. All protective facilities must be in place and well-equipped for the generator set to start up and run normally.
9. Ensure that the genset generator maintenance and load are connected to a proper ground.
10. The load on the unit and on-site must be operated by qualified operators, and safe operation regulations must be observed.
11. After the unit is started, check whether there is any leakage and abnormal noise, and make sure that it can be switched on and transmitted after it is normal.
12. Check the indicating instruments at the specified time, pay attention to the pressure of lubricating oil, whether there is any change in water temperature, the pressure of lubricating oil should not be lower than 150KPa, and the temperature of cooling water should not be higher than 95℃.
13. Before stopping the unit, ensure that all loads are withdrawn.
Matters needing attention
1. Non-workers are prohibited from entering the work site.
2. The operator must wear insulated gloves and insulated shoes before operating the unit.
3. The operation should be carried out in strict accordance with the generator operating regulations.
4. During normal operation, it is not allowed to turn on and off the machine without the consent of the person in charge of the site, except for emergencies.
5. The type of generator set must be on duty 24 hours a day, and the generator set operation form must be filled in carefully.
6. If there is any abnormal condition of the unit, it should be reported to the person in charge of the on-site project in time.
7. Night shift personnel must be on duty on time, implement a hand-in-hand transfer system, strengthen inspections, and are not allowed to leave their posts without permission, and are not allowed to sleep.
8. It is forbidden to operate the generator set after drinking alcohol.
9. It is strictly forbidden to bring flammable and explosive materials into the work site.
10. Adhere to the on-duty system, keep a record of shifts and make clear responsibilities.
11. To be familiar with the performance of various fire-fighting equipment, and be proficient in using methods. It is strictly forbidden to misappropriate fire-fighting equipment or discard or lose them, and must be inspected once a month.